EDC Newsletter

First Name:
* E-mail:
* Re-enter code in field below:

Email marketing by Webcore

Member Login



Property Search

Property Categories

logo-growingon


New Castle Utilities Water Rate Schedule
Thursday, 19 August 2004 20:11
smaller text tool iconmedium text tool iconlarger text tool icon

UTILITIES > NEW CASTLE WATER RATE SCHEDULE

Information on New Castle water rate schedules such as monthly meter rates, minimum schedules, connection charges and more.

 

Meter Rates Per Month

METERED RATE RATE PER 100 CU. FT. UNITS
First 500 cu. ft. $2.30 5th
Next 1,500 cu. ft. $2.15 6-19
Next 4,000 cu. ft. $1.91 20-59
Next 14,000 cu. ft. $1.79 60-199
Next 45,000 cu. ft. $1.57 200-649
Next 135,000 cu. ft. $1.44 650-1,999
Next 200,000 cu. ft. $1.22 2,000-3,999
Next 400,000 cu. ft. $0.94 4,000-99,999

Metered User Minimum Schedule
Each user shall pay a minimum charge for which the user will be entitled to the quantity of water set out in the above schedule of rates.

SIZE OF METER

RATE

UNITS
5/8 - ¾" $9.20 4
1" $27.68 13
1¼" $36.91 17
1½" $46.19 21
2" $69.16 33
3" $92.34 45
4" $184.52 96
6" $369.03 199
8" $1,507.33

Fire Hydrant Rate

PUBLIC OR PRIVATE HYDRANT

$533.68 per annum

$46.14 per month

BULK WATER PERMIT FEE

Yearly charge for each 1,000 gallons

$40.00

$5.00

Automatic Sprinklers

CONNECTION SIZE

PER MONTH

PER ANNUM

1" connection $1.29 $15.45
1½" connection $2.89 $34.68
2" connection $5.13 $61.56
3" connection $11.53 $138.36
4" connection $20.50 $246.00
6" connection $46.09 $553.08
8" connection $82.13 $985.56

Connection Charge

5/8" connection $300.00
3/4" connection $300.00

For connections requiring one inch meter sizes or larger, the connection charge shall be actual time and expense charges incurred by the utility including the cost of labor materials and equipment but in no event shall the cost be less than $300.00.

Last Updated on Saturday, 15 August 2009 22:27
 

Latest Sites

20,000 SF Building
Warehouse Industrial
20,000 SF Building